86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


Cangzhou Spiral Steel Pipe Group Co.,Ltd

Products >> IPN8710 Polymer Coating Anticorrosive

IPN8710 Polymer Coating Anticorrosive

Build Your Online Product Catalogs?



Description
Product Name: IPN8710 Polymer Coating Anticorrosive
Supply Ability:
Related proudcts steel pipe, spiral steel pipe, 3pe coating,
Specifications ¦Õ219 to ¦Õ3500mm
Price Term: FOB
Port of loading: Tianjin
Minimum Order ¶Ö
Unit Price:

Comprise:IPN8710 primer coating is made of polyurethane polyethylene, modified epoxy resin, non-toxic anticorrosive pigment-packing, accessory ingredient and so on.

Property: the film has good tenacity, adhesion, wear-resisting, antirust and anticorrosion.

Using: be suit for sunken pipe, including suitable for various kinds of soil condition , Submerged structures and steel pile for ***k etc.

Technical indicators:

Project
indicators


Paint film appearance
flat and smooth


Drying time(h)

£¨25¡À1℃£©
surface dry ¡Ü
6

hard dry ¡Ü
24


Suppleness(mm) ¡Ü
5


Adhesive force(Guoquan method) grade ¡Ü
3


Shock resistance kg¡¤cm
40


NVV(%) ¡Ý
70



Construction parameter:

Matching: read bucket stick

Pot life: 8 hours

Diluents and dosage: dedicated diluents ¡Ü5%

Painting method: brushing, roller coating or spraying.

Painting interval: Min 4hours; Max 3 days.

Flm thickness: wet film: 200¦Ìm; dry film 120¦Ìm.

Theoretical Quantity: 250g/m

Surface treatment: eliminate the gungo, dust, welding slag, rust material from the Anti-corrosion parts, keep the surface dry and clean.

Supporting Primer:IPN8710 Anticorrosive primer,IPN8710-4 thick liquid Anticorrosive primer etc.

Storage life:12 monthes

Announcements£º

1 The product should be kept in a cool, ventilated and dry place, isolation from the fire, keep away from heat.
2.This product is thick-liquid, can be high build and it is better no sagging. It is no need to add diluents before brush coating.
3.If the painting stored too long, there may be some sediment exist, so it is need to stirring before brush coating.
4.After the painting prepared, it is need to wait 20 Mins in summer, 1.5¡ª2 hours in winter for curing.
5.It is need to spread the finish when the primer is surface dry, and the interval should be less than 2 days under indoor temperature, otherwise it maybe affect the interlayer bonding. It is better to spread the finishes whe

Contact Us
Company: Cangzhou Spiral Steel Pipe Group Co.,Ltd
Contact: Ms. Liu Cathy
Address: No.92 JieFang East Road, Xinhua District, Cangzhou City
Postcode: 061000
Tel: 0317-3565304
Fax: 0317-3205076
E-mail:         


Copyright© Cangzhou Spiral Steel Pipe Group Co.,Ltd All Rights Reserved.
Tel : 0317-3565304 Fax : 0317-3205076
Powered by 86exporter.com